06 - Verification and documents
Navigation: Index | previous: 05 - Company workspace | next: 07 - Shipper loads Last checked against the application: 25 Nov 2026
1. Who this guide is for
- A company's Owner or the person who handles its papers (permission
settings.documents). Everybody who registered a company needs this guide, because no activity opens until Traincu staff approve it, and staff approve on the evidence of your papers. - Any member who wonders why a screen is closed or limited: a Pending, Rejected or Restricted activity is explained here.
- The staff side of the same flow (the verification queue and the decision screen) is in 21 - Admin operations.
- Module: M02 Verification and Compliance. A personal (individual) account has no papers and no activities; it does not use this screen.
2. What you can do here (summary)
| Activity | Who | Screen(s) |
|---|---|---|
| See which papers your activities need and where each stands | settings.documents |
C-03 > Papers your activities need |
| Upload a paper | settings.documents |
C-03 > Upload document |
| Correct or remove a paper nobody has verified yet | settings.documents |
C-03 > row Edit / Remove |
| Read a paper's record and its status | settings.documents |
C-03 > one document |
| Print the record of a paper | settings.documents |
C-03 > one document > Print |
| Re-check the commercial registration (CR) at Wathq | settings.documents |
C-03 > Re-check CR |
| Read what staff asked for or refused | settings.documents |
C-03 banners and the company home |
| Add another activity and follow its approval | settings.company |
C-02 > Activities tab |
| Ask again for a rejected activity | settings.company |
C-02 > Activities > Ask again |
| Renew a licence that ended and get the activity lifted | settings.documents |
C-03 > Upload the renewed ... |
3. Before you begin
- Sign in and register the company first (see 01 - Getting started and your account).
- The Owner role holds
settings.documentsandsettings.company; another role needs them given in Settings > Roles. - The registry check (Wathq) is OFF by default (and "fake" only on a developer machine). Until Traincu staff switch it on at Settings > Integrations, the Commercial registration at Wathq panel and the Re-check CR button do not appear, and staff verify the papers by hand. Everything below that mentions Wathq is "only when it is on".
- Which papers an activity asks for is a proposal, to be confirmed by the business (a one-file setting in the platform). The table in 6.1 shows today's list.
- Files: PDF, JPG or PNG, up to 5 MB. The file is stored privately and opened only through the application, by your company's members with the right permission.
- A queue worker must run, or the messages to the owner (approved, refused, "paper ending soon") never leave.
4. Where to find it
| What | Where |
|---|---|
| The papers list (C-03) | Workspace > Company > Settings > Company > Verification and documents, address /settings/company/documents |
| One paper | Click Open on a row, /settings/company/documents/{id} |
| Upload form | Upload document (button on C-03), /settings/company/documents/new |
| Activities and their approval | Settings > Company > Company profile > tab Activities, /settings/company/profile |
| Notices | The company home (/dashboard/home) and the top of C-03 |
| "Company papers" tile | The company home, for people who hold settings.documents |
5. The big picture (flowchart)
flowchart TD
a1(["Company registers - activities are Pending"]) --> b1["Open Verification and documents"]
b1 --> b2["See Papers your activities need"]
b2 --> b3["Upload each missing paper"]
b3 --> sys1[["Paper is Under review, the request waits in the verification queue"]]
sys1 --> n1[/"Traincu staff check the papers and the registry"/]
n1 --> d1{"Staff decision on the activity"}
d1 -->|"Ask for a document"| b4["Notice with the note - upload what was asked"]
b4 --> sys1
d1 -->|"Reject"| e1["Activity is Rejected with the reason in your language"]
e1 --> b6["Fix what the reason names, press Ask again"]
b6 --> sys1
d1 -->|"Approve"| sys2[["Activity is Approved, its screens open, licence number and end day are kept"]]
sys2 --> sys3[["Company gets the verified mark on the first approval"]]
sys2 --> w1[["Daily checks watch the licence end day and the CR"]]
w1 --> d2{"Licence ended?"}
d2 -->|"Yes"| e2["Activity becomes Restricted"]
e2 --> b5["Upload the renewed licence"]
b5 --> n1
d2 -->|"No"| ok1(["Keep trading - renewals before the end day"])
6. Activities, step by step
6.1 See which papers your activities need
Purpose - Know exactly what to hand in. Who - settings.documents.
Steps - Open Verification and documents. Under the banners, the card Papers your activities need lists one row per paper with: its name, "Needed for: ACTIVITY, ...", the expiry date of the paper handed in, a badge and a button. The card header says "N papers to hand in" or All handed in.
| Activity | Papers asked |
|---|---|
| Carrier, Owner-operator | Commercial registration (CR), Transport licence, Insurance policy |
| Shipper, Equipment, Parts | Commercial registration (CR) |
| Workshop, Insurance | Commercial registration (CR), Activity licence |
| Any activity, when the company gave a VAT number | also the VAT registration certificate |
Papers with an end date: CR, Transport licence, Insurance policy, Activity licence. The VAT certificate has none. Rejected activities ask for no papers.
flowchart TD
a1(["Open Verification and documents"]) --> sys1[["Platform works out the list from your activities"]]
sys1 --> d1{"For each paper: is there a current one?"}
d1 -->|"None"| b1["Badge Missing - button Upload"]
d1 -->|"Rejected"| b2["Badge Rejected with the reason - Upload again"]
d1 -->|"Expired or due soon"| b3["Badge Expired or Due soon - Upload again"]
d1 -->|"Under review or Verified"| b4["Badge Under review or Verified - Open"]
b1 --> h1(["Hand in what is missing"])
b2 --> h1
b3 --> h1
Buttons - Upload / Upload again opens the upload form with the paper already chosen; Open opens the record.
6.2 Upload a paper
Purpose - Hand in a paper for review. Who - settings.documents.
Steps
- Press Upload document (top right), or Upload on a row of Papers your activities need.
- Choose the Document kind (pre-chosen if you came from a row).
- Type the Number printed on the paper (such as the CR number), the Issued day and the Expires day. The star next to Expires shows when the kind has an end date.
- Choose the File (PDF, JPG or PNG, up to 5 MB).
- Press Upload document. The record opens with "The document was uploaded. It waits for review."
flowchart TD
a1(["Press Upload document"]) --> b1["Choose the kind and type number, issued, expires"]
b1 --> b2["Choose the file and press Upload document"]
b2 --> d1{"Fields and file valid?"}
d1 -->|"No"| e1["Fix the red fields"]
e1 --> b1
d1 -->|"Yes"| sys1[["File is stored privately, paper is Under review"]]
sys1 --> sys2[["Open requests are refreshed - a renewal reopens its closed request"]]
sys2 --> m1[/"Staff see it in the verification queue"/]
sys2 --> h1(["The record of the paper"])
Fields
| Field | What to enter | Rules / limits |
|---|---|---|
| Document | CR, Transport licence, Insurance policy, VAT registration certificate, Activity licence | Required; only the kinds meant for companies and switched on by staff |
| Number | The number on the paper | Optional, up to 60 characters |
| Issued | The day it was issued | Optional; not in the future |
| Expires | The day it ends | Required when the kind has an end date ("This paper expires: enter its expiry date."); after the issue date; within 30 years |
| File | The scan | Required on upload; PDF, JPG or PNG; up to 5 MB; the real file type is checked |
Buttons and actions
| Button | What it does | Who sees it |
|---|---|---|
| Upload document | Stores the paper and sends it to review | settings.documents |
| Cancel / Back to documents | Leaves without saving | Same |
What happens next - The paper is Under review. If staff had asked for a document (the yellow notice), that request counts as answered and the notice goes. If the paper is a NEW one for an activity already in use (a renewal), the activity's closed request is reopened so staff see it.
If something goes wrong
| Message | Fix |
|---|---|
| "Choose the file to upload." | Pick a file. |
| "The file is bigger than 5 MB." | Compress or rescan. |
| "This paper expires: enter its expiry date." | Fill Expires. |
| "The expiry date must be after the issue date." / "The issue date cannot be in the future." | Correct the dates. |
| A refusal that names the file | The file's real content is not a PDF, JPG or PNG: use a real scan. |
6.3 Correct or remove a paper nobody has verified yet
Purpose - Fix a mistake before staff have checked the paper. Who - settings.documents.
Steps - On the row (or the record) press Edit. The kind cannot change ("Upload a new document for another kind"). Change the number or dates, and tick a new File only to replace it ("Choose a file only to replace it."). Press Save changes: "The document was updated. It waits for review again." To take it away press Remove and confirm ("The paper DOC-0012 and its file will be removed.").
The lock. Once staff verify a paper it is history: Edit and Remove are not offered, and a direct try shows "A verified document cannot be changed or removed. Upload the new one instead." A renewal is always a new upload.
flowchart TD
a1(["Open a paper"]) --> d1{"Status is Verified?"}
d1 -->|"Yes"| e1["Locked - only Print. Upload a new paper for a renewal"]
d1 -->|"No - Under review or Rejected"| d2{"What do you want?"}
d2 -->|"Correct it"| b1["Edit: fix number, dates or file, press Save changes"]
d2 -->|"Remove it"| b2["Press Remove and confirm"]
b1 --> sys1[["Paper goes back to Under review"]]
b2 --> sys2[["Paper and its file are deleted"]]
6.4 What staff do with your papers (as you see it)
Staff open each request in the verification queue. For every paper they verify or reject it; for the activity they approve, reject or ask for a document. You see the result in these places, and the Owners are told by email and SMS (SMS only when a gateway exists) and by the bell and app push.
sequenceDiagram participant Co as Company owner participant Plat as Traincu platform participant Staff as Verification officer Co->>Plat: Upload papers Plat->>Staff: Request waits in the queue Staff->>Plat: Verify or reject each paper Staff->>Plat: Ask for a document, or reject, or approve the activity Plat->>Co: Notice on C-03 and the home, plus email and bell Co->>Plat: Upload again if asked Plat->>Staff: Request is open again
| What staff do | What you see | What you can do next |
|---|---|---|
| Verify a paper | Status Verified (locked), "Checked by NAME" | Nothing; renew before it ends |
| Reject a paper | Status Rejected with the reason in your language, on the row and on the record | Edit it or Upload again; it returns to review |
| Ask for document | A yellow notice "Verification asks for a document for ACTIVITY." with their note, on C-03 and the home | Upload or correct a paper; the notice goes |
| Reject the activity | A red notice "ACTIVITY was not approved." with the reason; the activity is Rejected | Fix what the reason names, then press Ask again (6.6) |
| Approve the activity | The activity is Approved, its screens open; its licence number and end day are kept | Start working |
The verified mark. The first time an activity is approved, the company gets its verified mark, but only when the CR is active at Wathq, or when Wathq is off and staff verified every paper by hand. A CR that Wathq reports as not active never makes a company verified.
What staff must have before approving (so you know what to prepare): every paper the activity asks for is verified; for an activity with a licence paper (Carrier, Owner-operator, Workshop, Insurance) the licence number and its end day; a staff note if the CR is not active at Wathq. The staff target is 24 to 48 hours (a request is marked overdue after 48 hours).
6.5 Re-check the commercial registration (CR) at Wathq
Note - only while the registry check is on. The panel and the button exist only when Wathq is switched on and the company has a CR number. Without Wathq, staff verify the CR paper by hand.
Purpose - Ask Wathq for today's answer about your CR. Who - settings.documents.
Steps - On C-03 the card Commercial registration at Wathq shows a status badge (Active, Suspended, Cancelled, Expired, Unknown, Not found at Wathq or Not checked yet), CR number, CR expires and Last checked. Press Re-check CR. You may do it once a day; after that the button is disabled and says "You can re-check the CR once a day. Try again after TIME."
flowchart TD
a1(["Press Re-check CR"]) --> d1{"Checked by you in the last 24 hours?"}
d1 -->|"Yes"| e1["Button disabled - try again after the time shown"]
d1 -->|"No"| d2{"Check on and a CR number on file?"}
d2 -->|"No"| e2["The CR check is switched off for now, or there is no CR number"]
d2 -->|"Yes"| sys1[["Wathq is asked for a fresh answer"]]
sys1 --> d3{"Did Wathq answer?"}
d3 -->|"No"| e3["Wathq is not answering - this did not use your daily re-check"]
d3 -->|"Yes"| sys2[["Status and CR end date are saved with a record of the check"]]
sys2 --> h1(["Message: The CR was checked: STATUS"])
Good to know - Each fresh check costs the platform a small fee (about SAR 2), which is why it is once a day. When you add an activity, a check of the last 7 days is reused. A CR that is no longer active clears the company's verified mark, but it does not restrict activities by itself; staff decide. A scheduled re-check also runs when the CR end date is within 30 days or past (once a week per company).
If something goes wrong - "Wathq has no registration under this CR number." (the number is wrong or not registered).
6.6 Add an activity and follow its approval
Purpose - Ask to work in a new area. Who - settings.company.
Steps - Open Company profile > tab Activities. The table shows Activity, Status, Licence number, Licence expires, Approved on. Under it Add activity: choose one from the list and press Add activity. "The activity was added. It waits for verification before its screens open." Its ready-made roles are prepared. Then hand in the papers it asks for (6.1).
A rejected activity is not final. Read the reason (on the Activities tab, on the home notice and on C-03). Fix it, for example upload or correct a paper, then press Ask again beside the activity (the red notice on C-03 has the same button, which opens this tab). The request returns to the verification queue as a new submission and staff decide again: "The activity was sent for verification again. It waits for a decision." The earlier refusal stays in the history.
stateDiagram-v2 [*] --> Pending : activity requested at registration or added later Pending --> Approved : staff approve with the papers verified Pending --> Rejected : staff reject with a reason in two languages Rejected --> Pending : the company presses Ask again Approved --> Restricted : licence ended, or staff or the platform limit it Restricted --> Approved : renewal verified, or staff lift it
| Status | Meaning | What you can do next |
|---|---|---|
| Pending | Waiting for verification; its screens stay closed. The home says "ACTIVITY waits for verification. Its screens open when it is approved." | Hand in the papers |
| Approved | Verified; screens and actions are open | Work. Renew licences before they end |
| Rejected | Not approved; the reason is shown (in Arabic for Arabic readers, otherwise English) | Fix it, then press Ask again |
| Restricted | Limited: menus stay and old data stays, but publishing a load, sending offers, being awarded, submitting listings or posting truck availability is refused with a sentence such as "Your carrier activity is restricted, so truck availability cannot be published." | Upload what is missing; see 6.7 |
6.7 Licence ended: restriction and renewal
Purpose - Keep a licence current so the activity is never limited, and fix it fast when it is. Who - settings.documents.
How it works. When staff approve an activity, the platform keeps its licence number and end day (taken from the verified licence paper). Every morning a check restricts any Approved activity whose licence ended before today (only while the platform switch "restrict on expiry" is on, which it is by default). You, the owners and everybody who holds settings.documents are warned before it ends: reminders at 60, 30, 15 and 7 days and on the day itself (the days of the paper's kind), once each, and a missed day is caught up. Each reminder is a bell alert for the people who handle papers and an email and SMS to the owners.
If it was restricted: a red notice on C-03 and the home says "ACTIVITY is restricted." with the reason, and a button Upload the renewed DOCUMENT. Upload the new licence (6.2). A NEW paper for an activity already in use reopens its request so staff can verify it. When staff verify the new licence with an end day in the future, the platform lifts the restriction by itself, updates the licence number and day, and tells the owners. Only a restriction that came from the licence ending is lifted this way; one staff made for another reason (or enforcement, or unpaid fees) is lifted by staff.
flowchart TD
a1(["Approved activity with a licence end day"]) --> w1[["Daily reminders at 60, 30, 15, 7 days and on the day"]]
w1 --> d1{"Renewed paper uploaded and verified before the end?"}
d1 -->|"Yes"| sys1[["Licence number and end day move forward"]]
d1 -->|"No"| sys2[["Next morning: activity becomes Restricted"]]
sys2 --> m1[/"Owners are told - notice on C-03 and the home"/]
m1 --> b1["Upload the renewed licence"]
b1 --> sys3[["Request reopens in the verification queue"]]
sys3 --> n1[/"Staff verify the new licence"/]
n1 --> d2{"End day in the future?"}
d2 -->|"Yes"| sys4[["Restriction is lifted, owners are told"]]
d2 -->|"No"| e1["Still restricted - upload a valid one"]
sys4 --> ok1(["Activity is Approved again"])
Paper statuses
stateDiagram-v2 [*] --> UnderReview : you upload UnderReview --> Verified : staff verify UnderReview --> Rejected : staff reject with a reason Rejected --> UnderReview : you correct it Verified --> DueSoon : within the first reminder, 60 days by default DueSoon --> Expired : the end day passes Verified --> Expired : the end day passes Verified --> Replaced : a later upload of the same kind Expired --> Replaced : a later upload of the same kind
| Status | Meaning | What you can do next |
|---|---|---|
| Under review | Waiting for staff | Edit or remove while waiting |
| Verified | Checked and locked | Print; renew before it ends |
| Due soon | Verified and ending within 60 days (the first reminder of its kind) | Upload the renewal |
| Expired | The end day has passed, whatever staff said earlier | Upload the renewal |
| Rejected | Staff turned it down; the reason is shown | Edit or upload again |
| Replaced | A later upload of the same kind counts now; this one stays as history | Nothing |
Which paper counts. For each kind, the last one uploaded that was not rejected is the current paper. A rejected paper never replaces the verified one before it. The status filter on the list uses the same rules.
6.8 Print the record of a paper
Open a paper and press Print: a PDF with the company's header and the record (kind, number, dates, who uploaded and checked it). The file itself is opened from the record (the link to the file). The list also has the standard Excel and PDF export of any list.
7. Screen by screen
C-03 - Verification and documents
Address - /settings/company/documents (route settings.company.documents); the Dev Pack design address is /app/company/documents. Who - the Owner and anybody with settings.documents.
What you see - From top to bottom: (1) yellow notices when staff asked for a document; (2) red notices for an activity that was not approved; (3) red notices for a restricted activity with Upload the renewed ...; (4) the card Commercial registration at Wathq (only while the check is on); (5) the card Papers your activities need; (6) the list Documents with the columns Document, Number, Issued, Expires, Checked by, Status and row buttons Open, Edit, Remove; filters Type and Status (Under review, Verified, Due soon, Expired, Rejected, Replaced); search by number, kind or DOC-0012. With no paper yet: "No documents yet" and a big Upload document button.
What you can do - Upload document, Re-check CR, Open, Edit, Remove, export, and the links in the cards. See 6.1 to 6.7.
Differences from the Dev Pack - The design lists the statuses Verified, Due Soon, Under Review and Expired; the build adds Rejected and Replaced. The design's note "Expired licence moves the activity to Restricted" is the daily check of 6.7. The Dev Pack roles say "Owner, admin": the real rule is the permission settings.documents.
Extra pages that have no Dev Pack code
Upload / edit form (/settings/company/documents/new, route settings.company.documents.create; /settings/company/documents/{document}/edit, route settings.company.documents.edit). The same form (6.2, 6.3). An edit of a verified paper is redirected to the record with the lock message.
One paper (/settings/company/documents/{document}, route settings.company.documents.show). Document details with a status badge and the right banner (rejected with the reason, replaced, expired "This paper has expired. Upload the renewed one.", due soon "This paper expires in N days. Upload the renewed one in good time.", or the lock note), the data (Document, Number, Issued, Expires, Uploaded by, Checked by, File with size) and an image preview for a picture. Buttons: History, Print, Edit, Remove (the last two only while open), Back to documents.
Print the record (/settings/company/documents/{document}/print, route settings.company.documents.print). A PDF download.
Company profile, Activities tab (/settings/company/profile, route settings.company.profile; permission settings.company). See 6.6.
8. Tips and common questions
- Why are my menus closed after registering? Your activities are Pending. They open when staff approve them; hand in the papers to speed it up.
- Which paper does my activity need? See the table in 6.1 or the card Papers your activities need.
- I uploaded the wrong file. Can I change it? Yes, while it is Under review or Rejected: Edit and choose the right file. Not after it is Verified.
- Can I delete a verified paper? No. Upload the new paper; the old one becomes Replaced and stays as history.
- How long does staff approval take? The target is 24 to 48 hours. You are told by email, bell and notice on the home.
- My CR number does not match the registry. Staff compare the typed name with Wathq's; a mismatch is flagged for them. Correct the company's names in the company profile or explain in a reply to staff.
- Can I re-check my CR many times a day? No. Once a day (24 hours between two of your checks); a failed ask does not use the day.
- My activity became Restricted overnight. A licence end day passed. Upload the renewed licence; when staff verify it the restriction is lifted by itself.
- Who is told that a paper is about to expire? Everybody with
settings.documents(bell) and the owners (email, SMS). Reminders go once at each step: 60, 30, 15, 7 days and on the day. - Where do I see what staff asked me? The yellow notice on C-03 and on the company home, and the email.
- Can I add an activity later? Yes, in Company profile > Activities > Add activity; it goes through the same check. A rejected activity is asked for again with Ask again.
- Who can see my files? Only your company's members with the permission, and Traincu verification staff while they review (every opening by staff is written to the audit log). A file is never a public link.
9. Page reference (for support and testing)
| Page | Address | Route name | Who can open (permission / activity) | Described in |
|---|---|---|---|---|
| Verification and documents (list) | /settings/company/documents |
settings.company.documents |
settings.documents |
6.1, C-03 |
| Upload a document | /settings/company/documents/new |
settings.company.documents.create |
settings.documents |
6.2 |
| One document | /settings/company/documents/{document} |
settings.company.documents.show |
settings.documents |
Section 7 |
| Edit a document | /settings/company/documents/{document}/edit |
settings.company.documents.edit |
settings.documents |
6.3 |
| Print the record (download) | /settings/company/documents/{document}/print |
settings.company.documents.print |
settings.documents |
6.8 |
| Company profile (Activities tab) | /settings/company/profile |
settings.company.profile |
settings.company |
6.6 |
Actions (buttons and forms)
| Action | Route name | Permission |
|---|---|---|
| Upload a document | settings.company.documents.store |
settings.documents |
| Re-check the CR at Wathq (once a day) | settings.company.documents.recheck |
settings.documents |
| Save changes to a document | settings.company.documents.update |
settings.documents |
| Remove a document | settings.company.documents.destroy |
settings.documents |
| Add an activity, or Ask again | settings.company.profile.activities.store |
settings.company |
The staff side of this flow (verification queue, decision screen, platform rules) is described in 21 - Admin operations and 22 - Admin platform settings. The phone app has the same two features: GET app/verification, and GET / POST app/documents (permission settings.documents); see 27 - Mobile app.